Department of Defense (DoD) EVM Requirements

Posted by Pinnacle Management Systems, Inc. on Tuesday, October 20, 2009

The current contract funding levels that require DoD EVM are outlined in the bullets below. This is a simplified description of the contract EVM requirements.  A full explanation can be found here.

Please note that the type of contract and other factors can affect the need for, or the type of Earned Value Management System that is required in a DoD EVM Proposal.  These include:

  • IT contracts, which requires the use of EVM at much lower Contract Values
  • Contracts of less than 12 months in duration may not require the use of EVM
  • High Risk projects may be required at lower Contract Values
  • Level of effort, time and materials, and services contract are considered on a case-by-case basis by the DoD Program Manager
  • Firm-Fixed Price contracts and subcontracts which may not require the use of EVM

Pinnacle has experience with suppliers to many of the DoD Agencies. These include suppliers to the Army, Navy and Air Force. We have helped or guided our clients through:

Talk to a Pinnacle professional about your needs today! Give Us a Call or Send Us an Email

 

Topics: Aerospace & Defense, Earned Value Management (EVM), Integrated Program Management (IPM), Deltek PPM, Oracle Primavera, Government & Public Sector, Microsoft EPM, forProject Technology

Pinnacle Management Systems, Inc.

By Pinnacle Management Systems, Inc.

Founded in 1993, Pinnacle provides a wide range of professional services through 4 primary service lines: Management Consulting, Technology Systems Implementation, Training & Education, Functional Fulfillment. Pinnacle has extensive experience implementing and optimizing enterprise-wide capabilities in all Project Management related practices.

More articles by Pinnacle Management Systems, Inc.

0 Comments